Left:  Kevin, Larry and Trevor work to establish a temporary room which will then be heated so that they can pour the basement floor.

Right:  Larry and Trevor pose for a picture.  Good looking guys - eh?

Left:  Inside the "room" it's pretty warm, and workers move the hose as they pour the floor in the basement of the fellowship hall.

Right:  Outside, the Pumper Truck blows the concrete down the tube and into the room.